# Ampervia > Ampervia surfaces off-market powered land for data centers and AI factories — idled or quietly > downsized industrial sites whose existing grid connections a new data center can inherit, > skipping the multi-year interconnection queue. These sites are listed on no marketplace and no > broker sheet, because their owners have not listed them: Ampervia finds them in the industrial > record itself (energy-consumption trajectories, insolvency dockets, land registries, and grid > capacity read node by node) and verifies them one by one across Europe and the United States. > Public views are redacted to zone level; site identities and full dossiers are released with > Ampervia Pro membership, and per-site mandates take a site from dossier to executable. Key facts (as of July 2026): - The flagship public asset is **the Ampervia Powered-Land Map** — verified off-market powered-land sites across Spain, Portugal, Italy, France, Germany, the United Kingdom, Ireland and the United States, on one page, switchable by region. - Europe: 62 verified brownfield sites across 7 countries, screened through the four-layer Ampervia Screen and scored 0–100 (the Ampervia Score). United States: early verified off-market inventory, steel-led, growing as verification completes. - Verification reads the raw record: years of energy-consumption trajectories across thousands of industrial facilities, insolvency dockets in seven legal systems, land registries, and grid capacity across thousands of transmission and distribution nodes, re-checked monthly. - Market context: powered land trades at a multiple of unpowered land because grid-connection queues run years while AI builds run months — power availability is the #1 data-center site-selection criterion. ## The Ampervia Powered-Land Map - [Ampervia Powered-Land Map](https://ampervia.com/powered-land-map/): interactive map of 62 verified brownfield powered-land sites across 7 European countries plus US retiring-plant grid capacity by state — switch region in one view, free, with coverage tables, the Ampervia Screen methodology and FAQ. ## Insights - [Insights index](https://ampervia.com/insights/): data-led articles on grid capacity, brownfield power and data-center site selection. - [Data-Center Power in Madrid & Aragón: 0 of 145 Transmission Nodes Open](https://ampervia.com/insights/madrid-aragon-0-145/): zero of 145 hub-region nodes show grantable demand capacity, while ≈82 GW sits available on 281 nodes elsewhere in Spain. - [Grid Scarcity Now Decides Where Data Centers Get Built](https://ampervia.com/insights/grid-scarcity-signals/): PJM capacity prices rose 833% in a year and Frankfurt's grid upgrades are frozen until the 2030s — why brownfield and behind-the-meter power win. ## Access (the ladder) - Free: the Ampervia Powered-Land Map — zone-level, open to all. - Free, registered: the full redacted ledger and every per-site teaser (work email + confidentiality/non-circumvention undertaking) at https://platform.ampervia.com/. - Ampervia Pro (membership): every scored site brief with the full dossier — identity, location, evidence file — on both continents, monthly refresh, first look at every new verified site. Terms inside the platform. - Per-site mandate: feasibility to executable — connection confirmed with the utility and system operator, transaction path, Go/No-Go. - Site owners / sellers: always free — a grid connection built for a plant's peak is a monetizable asset (hosting, sale, or repowering). ## Platform - [The Verified Ledger](https://platform.ampervia.com/): zone-level coverage map and aggregates public; full redacted ledger free after registration; identities and full dossiers with Ampervia Pro. Machine-readable summary: https://platform.ampervia.com/llms.txt ## Company - [Ampervia](https://ampervia.com/): we find where the power already is — for the next AI factories and data centers. - Operated by AI Media Ventures LLC, 1350 Avenue of the Americas, Fl. 2, New York, NY 10019, USA. - Contact: team@ampervia.com · https://ampervia.com/contact/ · https://www.linkedin.com/in/razvantoma/ - [Terms](https://ampervia.com/terms/) · [Privacy](https://ampervia.com/privacy/)